Description
The design requirements of high speed take-up operations are discussed. Problems and solutions in high speed take-up work are also considered.
$15.00
The design requirements of high speed take-up operations are discussed. Problems and solutions in high speed take-up work are also considered.
The design requirements of high speed take-up operations are discussed. Problems and solutions in high speed take-up work are also considered.
Author(s) | Greene, P.C.Davis-Standard, Div of Franklin Research Corp., The Louis Allis Co. |
---|---|
Publication/Event/Pages | Wire & Wire Products34(2): 195-196, 246-247 1959, Paper presented at WAI 28th Annual Convention, Atlantic City, NJ USA |
Year | 1959 |