KSM case study

$15.00

This study compares the process stability in an old extrusion line before and after some of the extruders were replaced with new ones. It concentrates on savings in material due to better process stability in the building wire line. Data from the two-year period before the update were compared with values after the changes.

Description

This study compares the process stability in an old extrusion line before and after some of the extruders were replaced with new ones. It concentrates on savings in material due to better process stability in the building wire line. Data from the two-year period before the update were compared with values after the changes.

Additional information

Author(s)

Stefan Askenfors, ACM AB, Sweden

Publication/Event/Pages

Paper presented at WAI 72nd Annual Convention, Chicago, IL USA

Year

2002