Maximizing uptime for extrusion

$15.00

This paper deals with realizing maximum throughput on the extrusion line. Topics such as fixed center crossheads, automatic bypass valves, automatic color change systems, and quick tool and head changes are discussed, providing an analysis of time and money savings.

SKU: P04271 Category: Tags: , ,

Description

This paper deals with realizing maximum throughput on the extrusion line. Topics such as fixed center crossheads, automatic bypass valves, automatic color change systems, and quick tool and head changes are discussed, providing an analysis of time and money savings.

Additional information

Author(s)

Thomas J. Siedlarz, Unitek North America, Inc., USA.

Publication/Event/Pages

Paper presented at WAI 64th Annual Convention, Detroit, MI USA. Paper published in Wire Journal Internatinal, June 1995, pg. 62.

Year

1994