Modernization of the No 1 oil-tempering line at US Steel Cuyahoga plant

$15.00

Modernization of the oil tempering line, including replacing tempering furnaces with fluidized-bed tempering furnaces, is described. The line is detailed; temperature profiles, product evaluations, and furnace performance are discussed.

Description

Modernization of the oil tempering line, including replacing tempering furnaces with fluidized-bed tempering furnaces, is described. The line is detailed; temperature profiles, product evaluations, and furnace performance are discussed.

Additional information

Author(s)

Gordon, C.R.U.S. Steel Corp., Montgomery, P.L.Rice, L.C.Sramek, D.H.Procedyne Corp., Fennell Corp.

Publication/Event/Pages

Wire Journal International14(9): 224-229 1981, Paper presented at WAI Pacific Coast Regional Meeting, Las Vegas, NV USA

Year

1981