Optimization of material consumption at the extrusion of medium and high voltage cables in CV lines

$15.00

X-ray measurement, performed directly after the crosshead, combined with a control system; which gets its information directly out of the scan data; reduces material consumption to a minimum. A generally too strong wall thickness, chosen as a precaution, and CV line start-up scrap are things of the past. Based on the above mentioned aspects, the author presents the possibility of simultaneous measurement of all three layers of medium and high voltage cables.

Description

X-ray measurement, performed directly after the crosshead, combined with a control system; which gets its information directly out of the scan data; reduces material consumption to a minimum. A generally too strong wall thickness, chosen as a precaution, and CV line start-up scrap are things of the past. Based on the above mentioned aspects, the author presents the possibility of simultaneous measurement of all three layers of medium and high voltage cables.

Additional information

Author(s)

Harry Prunk, Sikora Industrie- elektronik GmbH, Germany

Publication/Event/Pages

Paper presented at WAI 67th Annual Convention, Atlanta, GA USA

Year

1997