Rod handling by overhead tramrail

$15.00

An overhead tramway used at the Sparrows Point plant of Bethlehem Steel Co. for the easy, efficient handling of rod is described. This system is the largest of its type in existence, and includes 25 miles of track.

SKU: P00681 Category: Tags: ,

Description

An overhead tramway used at the Sparrows Point plant of Bethlehem Steel Co. for the easy, efficient handling of rod is described. This system is the largest of its type in existence, and includes 25 miles of track.

Additional information

Author(s)

Bethlehem Steel Corp.

Publication/Event/Pages

Wire & Wire Products14(4): 214-215, 235 1939

Year

1939