Description
The requirements of a high speed dual take-up line are discussed. Control, the proper automatic operation, serviceability, and safety in operation are considered. (Paper presented at WA 28th Annual, Oct, 1958.)
$15.00
The requirements of a high speed dual take-up line are discussed. Control, the proper automatic operation, serviceability, and safety in operation are considered. (Paper presented at WA 28th Annual, Oct, 1958.)
The requirements of a high speed dual take-up line are discussed. Control, the proper automatic operation, serviceability, and safety in operation are considered. (Paper presented at WA 28th Annual, Oct, 1958.)
Author(s) | Minardi, O.The Entwistle Co. |
---|---|
Publication/Event/Pages | Wire & Wire Products34(2): 201, 240-241 1959, Paper presented at WAI 28th Annual Convention, Atlantic City, NJ USA |
Year | 1959 |