Wire manufacturing testing and control

$15.00

Testing and control procedures used during the manufacture of telephone wire on 48 high-speed tandem lines at the Bell System plant in Omaha, NE are described. Operations include wiredrawing, insulation, extrusion, pair twisting, and cabling. Critical parameters are cable resistance and coaxial capacitance, wire diameter, wire elongation, and insulation properties.

Description

Testing and control procedures used during the manufacture of telephone wire on 48 high-speed tandem lines at the Bell System plant in Omaha, NE are described. Operations include wiredrawing, insulation, extrusion, pair twisting, and cabling. Critical parameters are cable resistance and coaxial capacitance, wire diameter, wire elongation, and insulation properties.

Additional information

Author(s)

Hartman, A.E.Western Electric Co. Inc.

Publication/Event/Pages

Wire Journal7(3): 65-72 1974

Year

1974